• Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction
  • Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction
  • Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction
  • Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction
  • Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction
  • Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction

Prefabricated Light Metal Steel Structure Airplane Aircraft Storage Hangar Construction

Certificate: ISO9001:2008, SGS and BV Certification
Drawing Design: CAD or 3D Drawing
Type: H-Section Steel
Standard: GB
Trademark: Quality Carbon Structural Steel and Alloy Structural Steel, Xinmao
Forming: Hot-Rolled Steel
Customization:
Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
S-12
Connection Form
Bolt Connection
Member
Steel Column
Type of Steel For Building Structure
H-Section Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Transport Package
Packaged with Pallet /According to Clients′ Requir
Specification
4880sqm(Total 2 sets with 40m2 partial floor)
Origin
Shandong, China
HS Code
9406900090
Production Capacity
5000t/Month

Product Description

PRODUCT DESCRIPTION_____________________________________________

airplane hangar


 
airplane hangar 
 
BIG Building area:4880sqm(Total 2 sets with 40m2 partial floor)
Length(m) 60  
Width(m) 40  
Height(m) 8  
Hangar door size  38m*6.5m  
Small building area :2400 sqm (Total 4 sets ) Length(m) 30  
Width(m) 20
Height(m) 8  
Hangar door size  18m*6.5m  
Main steel structure Q345B H Bcolumn/beam Q345B H column/beam  with 2 times mid-grey anti-rusting painting  
Roof purlin Q345B C Channel Galvanized 275gr/m2  
Wall purlin Q345B C Channel Galvanized 275gr/m2  
Secondary frame tie tube:180x6.0, Q235B Q345B H column/beam  with 2 times mid-grey anti-rusting painting  
bracing: steel bar 25mm, Q235B Q345B H column/beam  with 2 times mid-grey anti-rusting painting  
Roof panel V960 Insulated Steel Sandwich Panel, 
0.4mm/50mm glass wool/0.5mm,
glass wool=60kg/m3, whitesea blue steel sheet, RAL-5015
 
Wall panel V-900 single steel sheet, 0.6mm thick, white  
Window Aluminium-alloy Window Door:Professional hangar door and steel door   
 

 

Main Parts.

Name: H columns&beams

Brand: Xinmao
Original: Shandong, China 

Purchasing from Lai-steel group, quality guaranteed, accurate design, cutting, assembling, welding, painting, packing etc. 

Secondary frame.Name: Wall&roof purlin

Brand:Xinmao

Original: Shandong, China

Q345, Q235 steel grade, Z&C-section profile, galvanization thickness 275g/sqm. 

 
   

Wall&Roof Panels

Name: wall&roof sandwich panel

Brand: Xinmao
Original: Shandong, China

Wall Panels

50 mm-thick EPS sandwich panels are used with two sides of film for protection. The metal steel sheets are white-grey, RAL 9002. 

PACKING & DELIVERY___________________________________________
 

Steel frame.

All the steel columns and beams will be packed and sticked to the steel pallets to load into the shipping container, which will also save the energy and cost of unloading at the site.

Weight.

around 20 tons per 40'HQ shipping container

Wall&Roof sandwich panels

With films on two sides to protect the sanwich panels from the crashing during the loading and transportation. 
 
 
   

Pre-Sales Service.

* Inquiry and consulting support. 

* Sample testing support. 

* View our Factory.

After-Sales Service.

* Training how to instal the building, training how to maintenance the building. 

* Engineers available to service installation overseas.

FAQ___________________________________________________________

Q1.How about your payment term?
A: Both TT and L/C will be accepted. 30% deposit before producing and 70% balance before loading by TT will be more preferred

Q2. How about your delivery time?
A: It depends on order quantities. Noramlly, the delivery time will be 45 days after getting the deposit. 

Q3. How to make the packing?
A: The steel frames will be packed by pallets first, then loading them into the shipping container, which will be easy to unload at the site and save the cost for you. All the ends will be packed by the blankets or bubble plastic films. 
The sandwich panels will also be packed first. 

Q4. Can you provide the installation help?
A: Yes. We can provide you all the drawing by Tekla model, then you can check each part vividly at the site. The installation drawing will also be provided. For some special parts, we can send you the vedio installation guidance. If for some difficult part, we can send our engineers there for installation guidance. If you need, the workers can also be help there. But the cost for them, including the turn-round airplane tickets, accommodation cost at the site, etc. will be born by you there. 

OUR COMPANY_________________________________________________

Qingdao Xinmao ZT Steel Construction Co., Ltd.

 
Since:2003
Staff: 486 people, 40 engineers, 12 designers, 25 professional engineering and technical personnel.

Area : More than 50000 sqm .

Product Capacity :5000 TON per month 

Service : We offer design, product, installation one-stop service,we also can send our experienced engineers to your country to guide construction

CONTACT______________________________________________________

Penny xu 
Project manager 
Mobile :+86-13625426367
Qingdao Xinmao ZT Steel Construction Co., Ltd
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
178
Year of Establishment
2012-07-02