Customization: | Available |
---|---|
Connection Form: | Bolt Connection |
Name: | Steel Structure Warehouse |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Advantages of warehouse building construction materials as follows
1. Features: fast and flexible to assemble, secure and safe, thermal and noise insulation, water proof and fire prevention;
2. Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
3. Durability: The whole steel structure is easy in maintenance, which can be used for more than 50 years.
4. Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
5. Carrying capacity: can resists the impact of strong wind and seismic performance and bears heavy snow loads.
Item Name | building construction materials |
Main Material | Q235/Q345 Welded H Beam and Hot Rolled Section Steel |
Surface | Painted or Hot Dip Galvanized |
Roof & Wall Panel | EPS Sandwich panel /Single Corrugated Steel Sheet/ Colour sheet with Glass-wool, for customers choose |
Window | PVC Steel or Aluminum Alloy |
Door | Sliding Door or Rolling Up Door |
Service | Design steel structure warehouse drawings, Fabrication and Installation |
We can make quotation according to customer's drawing or requirement | |
(size by length/width/height and wind speed), offering a free design | |
drawing and all detailed drawings for installation. | |
Packing | According to customer's requirement |
Load into 40/20GP,40HQ or 40OT |
Beam | H-Section Steel Q235B, Q345B |
Purlin | Zinc Plating Steel Plate |
Column | Hot Rolled Steel(HRS), Steel Plate |
Base | Foundation bolts (Q235B) |
Surface | Zinc Plating, Paint |
Surface Color | According to Your Request |
Rain spout | PVC |
Plywood | Glass Wool, Polyurethane, Rock Wool, EPS |
Connecting | High-strength bolts, Plain bolts |
Main Material | Q235B /Q345BWelded H Beam and Hot Rolled Section steel structure |
Door | Rolling Door or Sliding Door |
Window | PVC or Aluminium Alloy Window |
Roof | Colorful steel plate 0.326~0.8mm thick,or sandwich panel with EPS, Rock Wool, etc insulation thickness around 70mm~120mm. |
Wall | Sandwich Panel, Rock Wool, EPS |
1 | Location (where will be built) ? | _____country, area |
2 | Size: length*width*height? | _____m*_____m*_____m |
3 | wind load (or max. wind speed)? | _____km/h |
4 | Rain & snow load (or max. snow height)? | _____kn/m2, _____mm |
5 | anti-earthquake _____level ? | |
6 | Usage of the building? | |
7 | roof panel and wall panel? | You could choose sanwich panel, EPS, fiberglass wool, rockwool, PU sandwich. You could choose corrugated steel sheet and glass wool installed together on site either. |
8 | brickwall needed or not? | If yes, 1.2m high or 1.5m high ? |
9 | crane needed or not? | If yes, _____units, max. lifting weight____tons; max. lifting height _____m |
Pre-Sale Service | Consultant service (Answering client's questions) Primary design plan(Free) Assisting client to choose suitable construction plan Price calculation Business&technology discussion |
Sale Service | Submission of supportreaction data for foundation submission of construction drawing Providing requiremrnts for embedding Construction Manual Fabrication & Packing Statistical table of material Delivery Other requirements by Clients |
After-Sale Service | Service of installation Supervision Instruction for using after installation completed |
11.FAQ
a. What kind of company you are?
We are steel construction building materials Manufacturer located in Qingdao China, We were gaining good reputation among our customers for our professional, warm and thoughtful service. Because we know that a long terms business based on the quality control, price, packing, delivery time etc.
b. Does your company is a factory or trade company?
We are factory, so you will enjoy the best price and competitive price. Our factory covers an area of 150,000 square meters.
c. Whats the quality assurance you provided and how do you control quality ?
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc.
d. Can you offer designing service?
Yes, we have more than 100 design engineers. We could design full solution drawings as per your requirments. They use software: Auto CAD,PKPM, MTS, 3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc.
e. Do you offer guiding installation on site overseas?
Yes, we can provide the service of installation, supervision and training by extra. We can send our professional technical engineer to surpervise installation on site overseas. Besides, We also have our own abroad guiding installation team consisting of more than 30 people.
They have succeeded in many countries, such as Iraq, Dubai, South Africa, Algerial, Ghana, Gabon, Tajikistan, Burkina Faso, Panama, Australia.
12. Projects and Customers
If you have any quoestion for building construction materials, you can feel free to contact me.