• Big Prefab Building Prefabricated Steel Structural Building for Warehouse
  • Big Prefab Building Prefabricated Steel Structural Building for Warehouse
  • Big Prefab Building Prefabricated Steel Structural Building for Warehouse
  • Big Prefab Building Prefabricated Steel Structural Building for Warehouse
  • Big Prefab Building Prefabricated Steel Structural Building for Warehouse
  • Big Prefab Building Prefabricated Steel Structural Building for Warehouse

Big Prefab Building Prefabricated Steel Structural Building for Warehouse

Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Type: H-Section Steel
Standard: GB, ASTM, DIN, JIS, AISI, BS
Trademark: Carbon Structural Steel, China-steelconstruction
Forming: Cold Drawn Steel
Connection Form: Bolt Connection
Customization:

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
XMZT-SS
Member
Steel Column
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Connector
Name
Prefab Building
Main Material
Hsection, C Section, Zsection Steel Structure
Material
Sandwich Panel
Design
Customized
Transport Package
Standard Export Package, 40 Hq Container
Specification
CE/ISO9001
Origin
Qingdao, Shandong, China(Mainland)
HS Code
8401409010
Production Capacity
50000 Tons /Month

Product Description

Big Prefab Building prefabricated Steel Structural building for warehouse
    Qingdao XinmaoZT Steel Construction Co., Ltd.

 

Staff:486 people, 40 engineers, 12 designers, 25 professional engineering and technical personnel.
Area :More than 50000 sqm .
Product Capacity :5000 TON per month
Service :We offer design, product, installation one-stop service,we also can send our experienced
Engineers to your country to guide construction

Item Specification
 Main Steel Frame Column Q235, Q345 Welded H Section Steel
 Beam Q235, Q345 Welded H Section Steel
 Secondary FramePurlin Q235 C and Z purlin
 Knee brace Q235 Angle Steel
 Tie RodQ235 Circular Steel Pipe
 Brace Q235 Round Bar
Vertical and Horizontal  Support Q235 Angle Steel, Round Bar or Steel Pipe
 Maintenance system Roof PanelEPS Sandwich Panel /  Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel  Sheet
 Wall Panel Sandwich Panel / Corrugated Steel Sheet
 Accessories Window Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window
 DoorSliding Sandwich Panel Door / Rolling Metal Door / Personal Door
 Rainspout PVC
 Live load on Roof In 120kg/Sqm (Color steel panel surrounded)
 Wind Resistance Grade 12 Grades
 Earthquake-resistance 8 Grades
 Structure Usage Up to 50 years
 Finishing Options Vast array of colors and textures available
 Paint Options Alkyd paiting, two primary painting, two finish painting
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized.



Oversea projects we undertook in the last few years:
Industrial Warehouse (13000 M2 )-Argentina
Warehouse (14000M2)---- Republic of Uzbekistan
Workshop (12000M2)----Canada
Roof Truss(10000M2)--- Congo
Vegetable Market(2500M2)---- Mauritius
Pig shed(3500M2)---USA
Chicken shed(2800M2)-Australia
Aircraft Hangar(1300M2)------Australia
Warehouse(900M2)---- Mongolia
Prefabricated house(70M2)----800 sets---Angola
Container house(20')-----60 sets-South Africa

Steel frame
All the steel columns and beams will be packed and sticked to the steel pallets to load into the shipping
Container, which will also save the energy and cost of unloading at the site.


Weight.
Around 20 tons per 40'HQ shipping container

Wall&Roof sandwich panels
With films on two sides to protect the sanwich panels from the crashing during the loading and transportation.


  RFQ

Q1.How about your payment term?
A: Both TT and L/C will be accepted. 30% deposit before producing and 70% balance before loading by
TT will be more preferred

Q2. How about your delivery time?
A: It depends on order quantities. Noramlly, the delivery time will be 45 days after getting the deposit. 
Q3. How to make the packing?
A: The steel frames will be packed by pallets first, then loading them into the shipping container, which
will be easy to unload at the site and save the cost for you. All the ends will be packed by the blankets
or bubble plastic films. 
The sandwich panels will also be packed first. 

Q4. Can you provide the installation help?
A: Yes. We can provide you all the drawing by Tekla model, then you can check each part vividly at the site.
The installation drawing will also be provided. For some special parts, we can send you the vedio
installation guidance. If for some difficult part, we can send our engineers there for installation guidance.
If you need, the workers can also be help there. But the cost for them, including the turn-round
airplane tickets, accommodation cost at the site, etc. will be born by you there. 




Requirement:
---------------------------------------------------------------------------------------------------
1. Width__________M
2. Length________M
3. Space distance between columns:________M
4. Eave high__________M
5. Brick wall or concrete wall high(if any)_________M
6. Roof slop grade___________(°or%)
7. Ventilation: 1)no 2)normal 3)natural 4)ventilator
8. Wall and roof: 1) EPS sandwich panel 2)PU panel
                              3)rock wool panel 4) steel sheet thickness:__________________
9. Door: 1)sandwich panel sliding door 2)rolling door size:__________________
10. Window: 1)aluminium window 2) PVC window size :_____________________
11. Lighting: 1)skylight board 2)thickness:__________
12. Draining: 1)natural draining 2)gutter
13. Crane: 1)yes 2)no 3)capacity_____T




 

Send your message to this supplier

*From:
*To:
avatar Mrs. Kathy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
178
Year of Establishment
2012-07-02