Prefabricated Sandwich Panel Prefab Container House Domitory for Student
1.Detailed Parameters:
Wall and Roof Materils: Sandwich panel
Structure: Light steel structure container house
Window: Aluminium alloy window or Plastic steel window
Door: Aluminium frame sandwich panel door.
Size: 20 feet; 40 feet
Payment term: 40% T/T, against order and the balance paid before delivery.
Delivery time: Within in one month after receipt of you full payment.
Component |
long beam |
3mm galvanized |
short beam |
2.5mm galvanized |
column |
3mm galvanized |
wall panel |
75mm EPS sandwich board |
roof panel |
75mm PU sandwich board |
Secondary
beam |
Z-shaped galvanized steel iron |
roof
insulation |
75mm polyurethane |
Floor panel |
18mm plywood panel+12mm laminated floor or
20mm cement-fiber +2mm PVC |
door |
Steel Security door,740mmx1950mm |
window |
PVC Sliding window with Rolling shutter,1100mmx800mm |
electronics, water
supply
and
drainage |
according to the local law |
Furniture |
Customized-made to your requirements |
2. Technical Parameter Of Mobile Prefab Steel Frame Container House for Home/Office/Domitory:
1. Wind resistance: Grade 11 (wind speed≤ 111.5km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.5KN/m2
4. External and internal wall heat transmission coefficient: 0.35Kcal /m2hc
5. Second floor load capacity: 150kg/m2
6. Live load of corridor/ balcony/walkway is 2.0KN/m2
The whole house system can be professional supplied under clients' design.
Roof, bottom frame, column and wall panels of the container house be flat-packed, thus minimizing the transportation volume, can be easily installed on site or be used for transition transportation.
3. Products advantage
1) Integrated base and roof, PU injected, excellent strength and tightness;
2) 0.426mm color steel sheet for sandwich wall panel, strong and beautiful;
3) Durable, beautiful, economic and environmental;
4) Long life time (Max. 10 years);
5) Easy to transport and assemble (Can load 7 units into one 40'HQ).
6) Plug & play: All stuff have been preinstalled in the container and you just need put it on site ,connect to electricity and water
4. About Us
1.
Founded in the year of 2003,professional in various prefab houses and container houses and steel structure making.
2. More than 50 R&D staff and
more than 400 workers
3
. 35, 000 square maters factory, full line production
4.
Qualification: CE(DIN18800), ISO9001, BV, SGS; ( CSA, AS/NZS, UL etc. )
5. High Construction Efficiency,
delivery time will be within 20 to 30 days
Installation service
*
Layout plan can be designed if needed.
*
Installation introduction / CD / installation drawing will be provided if needed.
*
Engineers and workers can be sent abroad for guidance and installation.
All stuff have been preinstalled in the container and you just need put it on site, connect to electricity and water
5. FAQ
1. Are you a factory?
Yes, we are real factory supplier for over 10 years, own a super technical team to serve adjusting design for customers.
2. What's the material of your products?
The steel frame is 3.75mm profiled steel plate. Roof and base is made of steel frame with C steel for purlins, and insulation with rockwool.
The wall is sandwich panel, there are options include EPS foam panel, rockwool panel, fiber glass wool panel and PU/PIR foam panel.
Sub floor is 15mm MGO board/fiber cenemnt board; sub ceiling is 9mm OSB board.
flooring is 1.5mm vinyl sheet, ceiling is 12mm PVC ceiling plate.
Window is UPVC sliding window, there are options of aluminium shutter or just alumi blade.
Entrence door is high strength security door, partition door is SIP door.
Electricity is 220V,50-60Hz.
Plumbing&drainage: optional, we can provide if needed.
3. Can you supply container house with adjustable design to adapt customers' using requirment ?
Sure, we have strong technology team, are able to do adjustment design for customers according to users' requirment and the using environment. You can provide us your drawing, and we will produce as your drawings.
4. What advantages of your products and company?
1) adjusting design are available from us , to adapt the market and using environment better, and help customers gain more competitions in your market.
2)longer product life .
5.How to ship the house?
It will be flat packed and loaded into the 20ft/40HQ shipping container.
All panels are protected with PE film, and steel structure warped with woven belt. Accessories will be packed with paper box or plastic bags. Windows and doors will be packed with wooden box.
6. delivery time?
It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
7.Installation?
A: We will provide detailed illustration photos and videos to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be borne by buyers.
Contact :
Mrs Kathy
Qingdao Xinmao ZT Steel Construction Co., Ltd.
Add: Room 201, Building 32, Tian'an Cyber Park, Chengyang, Qingdao, China