Flat Pack Prefabricated Modular Camping Mobile Container Houses

Product Details
Customization: Available
Material: Container
Design: According to Your Requirment
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
178
Year of Establishment
2012-07-02
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
  • Flat Pack Prefabricated Modular Camping Mobile Container Houses
Find Similar Products

Basic Info.

Model NO.
C-2
Usage
Dormitories, Warehouse, Temporary Offices
Certification
ISO
Customized
Customized
Transport Package
Package with Pallet
Specification
3-4 containers
Trademark
Xinmao
Origin
Qingdao
HS Code
9406900090
Production Capacity
200 Sets/Month

Product Description

3prefabricated modular camping mobile container houses or home building

Project Name                         Container house  2019/12/12
Bidder Qingdao XinmaoZT Steel ConstructionCo.,ltd Mr.HAN
Sale-in-charge                        Penny Xu Contact  information 40HQ
Quotation list FOB PRICE :$6500
NO. Item Unit        Quantity Remark
1 Main steel frame   
1 Frame set 4.00  size :L6000*W2500*H2591mm
3 mm
Including roof beam ,floor beam ,corner fitting, column, steel roof sheet and etc.
Color :grey white
2 Roof and Wall Protect System  
1 Wall panel m 200  V-1150 type 0.4/75mm glass wool/0.4 white grey 
2 Floor pcs 20  18mm+1.6mm
3 Window set 1150*1150mm+2/600*1150mm
4 Sliding door set 2100*750mm
5 Door (Steel) set 2100mm*800mm 
6 Bathroom  set  
7 Electric system set 23W
3 Painting  
1 Color could be adjust set 1  
4 package with  pallet+
Freight to Qingdao, THC,
Custome Application, ETC
set 1 1

It could be changed according to your inquiry 

Layout plan 2 



DETAILED IMAGES

PACKING & DELIVERY

Steel frame.

All the steel columns and beams will be packed and sticked to the steel pallets to load into the shipping container, which will also save the energy and cost of unloading at the site.

Weight.

around 20 tons per 40'HQ shipping container

Wall&Roof sandwich panels

With films on two sides to protect the sanwich panels from the crashing during the loading and transportation. 



SERVICE

Pre-Sales Service.

* Inquiry and consulting support. 

* Sample testing support. 

* View our Factory.

After-Sales Service.

* Training how to instal the building, training how to maintenance the building. 

* Engineers available to service installation overseas.


OUR COMPANY

Qingdao Xinmao ZT Steel Construction Co., Ltd.


Since:2003
Staff: 486 people, 40 engineers, 12 designers, 25 professional engineering and technical personnel.
Area : More than 50000 sqm .

Product Capacity :5000 TON per month 

Service : We offer design, product, installation one-stop service,we also can send our experienced engineers to your country to guide construction




FAQ

Q1.How about your payment term?
A: Both TT and L/C will be accepted. 30% deposit before producing and 70% balance before loading by TT will be more preferred

Q2. How about your delivery time?
A: It depends on order quantities. Noramlly, the delivery time will be 45 days after getting the deposit. 

Q3. How to make the packing?
A: The steel frames will be packed by pallets first, then loading them into the shipping container, which will be easy to unload at the site and save the cost for you. All the ends will be packed by the blankets or bubble plastic films. 
The sandwich panels will also be packed first. 

Q4. Can you provide the installation help?
A: Yes. We can provide you all the drawing by Tekla model, then you can check each part vividly at the site. The installation drawing will also be provided. For some special parts, we can send you the vedio installation guidance. If for some difficult part, we can send our engineers there for installation guidance. If you need, the workers can also be help there. But the cost for them, including the turn-round airplane tickets, accommodation cost at the site, etc. will be born by you there. 



CONTACT
Penny xu 
Project manager 
Mobile/+86-13625426367
Qingdao Xinmao ZT Steel Construction Co., Ltd

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier