This product is no longer promoted on Made-in-China.com. If you find any infringement or
sensitive information of it, please contact
us for
handling. Thank you.
Description Steel structure workshop included the main structure (steel beam/girder, steel column/pillar), the secondary structure( roof and wall purlin, steel bracing, tie-bar etc), door and windows, and other accessories.
Application Inidustry: Wokeshop, warehouse, and other industry facilities. Commerce: Mall, hotel, exhibition hall, office building. Public: School, library, sports stadium, churce, etc.
Advantages 1. Prefabricated. Fast and easy installation, time saving and labor saving. 2. Customized design, various layout, beautiful appearances, different colors for the walls and roof 3. Light weight, easy move and cost saving, 4. Removable, convenient to assemble or disassemble. Fast construction and easy installation 5. Environmentally, recycle, no waste produced 6. High strength, can resistance grade 8 earthquake Water proof, fire proof; Can resists strong wind and heavy snow. 7. Long life span. Can be used for more than 50 years. 8. Wide span, single or multiple spans, can have a maximum span distance in 36m without middle columns.
Specification
Stucture
For client information If you need we design for you, pls supply us the following parameter
Steel Structure Process:
1. Prepare raw materials: Cut steel plate or use internation size H section steel and angle steel, round tube, round steel, square tube etc.; 2. Assembly and welding: Our welders will follow the drawings to assemble the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding, this is the first quality check) 3. Sand blast: After finish welding and polishing, our sand blast effect can reach internation 2.5 high grade, very good for resist rust; (Secondary quality check) 4. Paint: Within 2 hours after sand blast, all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check) 5. Inspect the goods by client: After we finish a part of fabrication work, we will invite clients to check the goods before we pack the steel frame. 6. Packing and loading: If clients require us to load the goods by close containers, we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )
Packing: Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! Or according to customer's requirement.
Installation service * Layout plan can be designed if needed. * Installation introduction / CD / installation drawing will be provided if needed. * Engineers and workers can be sent abroad for guidance and installation. All stuff have been preinstalled in the container and you just need put it on site, connect to electricity and wate
About Us
1. Founded in the year of 2003, professional in various prefab houses and container houses and steel structure making. 2. More than 50 R&D staff and more than 400 workers 3.35, 000 square maters factory, full line production 4. Qualification: CE(DIN18800), ISO9001, BV, SGS; ( CSA, AS/NZS, UL etc. ) 5. High Construction Efficiency, delivery time will be within 20 to 30 days
Contact:
Qingdao Xinmao ZT Steel Construction Co., Ltd. Add: Room 501, Building 1, Yiyuanju, Qingdao, China Tel: 0086-532-67760041 Mobile: +86-15621140557 Miss cherry